| 图片 | 型号 | 库存 | 数量 | 规格书 | 系列 | 包装 | 产品状态 | 主要用途 | 输出及类型 | 电压 - 输出 | 电流 - 输出 | 电压 - 输入 | 稳压器拓扑 | 频率 - 开关 | 内容物 | 使用的 IC / 部件 | 功率 - 输出 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
551011367-061/NOPBEVAL BOARD LM2577 LM2585 LM2587 |
0 |
|
规格书 |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Up | - | - | - | - | - | Boost | - | Unpopulated (Bare) Board(s) | LM2577, LM2585, LM2587 |
|
TPS65279VTEVMEVAL BOARD FOR TPS65279V |
2 |
|
规格书 |
- | Box | Obsolete | DC/DC, Step Down | 2 Non-Isolated Outputs | - | 1V, 1.1V | 5A, 5A | 4.5V ~ 18V | Buck | 500kHz | Board(s) | TPS65279V |
|
TPS54614EVM-183EVAL BOARD FOR TPS54614 |
0 |
|
规格书 |
SWIFT™ | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 1.8V | 6A | 3V ~ 6V | Buck | 550kHz | Board(s) | TPS54614 |
|
TPS54610EVM-213EVAL BOARD FOR TPS54610 |
0 |
|
规格书 |
SWIFT™ | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 1.8V | 6A | 3V ~ 6V | Buck | 700kHz | Board(s) | TPS54610 |
|
TPS54972EVM-222EVAL BOARD FOR TPS54972 |
0 |
|
规格书 |
SWIFT™ | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 0.42V ~ 1.75V | 9A | 3V ~ 4V | Buck | 700kHz | Board(s) | TPS54972 |
|
TPS5403EVMEVAL BOARD FOR TPS5403 |
0 |
|
规格书 |
- | Box | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 3.3V | 1.7A | 4.5V ~ 28V | Buck | - | Board(s) | TPS5403 |
|
TPS65276VTEVMEVAL BOARD FOR TPS65276V |
0 |
|
规格书 |
- | Box | Obsolete | DC/DC, Step Down | 2 Non-Isolated Outputs | - | 1V, 1.1V | 6A, 3.5A | 4.5V ~ 18V | Buck | 500kHz | Board(s) | TPS65276V |
|
TPS5430EVM-173FEVAL BOARD FOR TPS5430 |
0 |
|
规格书 |
SWIFT™ | Box | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 5V | 3A | 10V ~ 35V | Buck | 500kHz | Board(s) | TPS5430 |
|
TPS5430EVM-136EVAL BOARD FOR TPS5430 |
0 |
|
规格书 |
SWIFT™ | Box | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 5V | 3A | 10.8V ~ 19.8V | Buck | 500kHz | Board(s) | TPS5430 |
|
OM13574ULEVAL BOARD FOR PCA9412A |
0 |
|
- |
- | Bulk | Active | - | - | - | - | - | - | - | - | Board(s) | PCA9412A |
|
OM13575ULEVAL BOARD FOR PCA9412A |
0 |
|
- |
- | Bulk | Active | - | - | - | - | - | - | - | - | Board(s) | PCA9412A |
|
|
551600142-002/NOPBEVAL BOARD FOR LM3150 |
4 |
|
规格书 |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LM3150 |
|
TPS54810EVM-213EVAL BOARD FOR TPS54810 |
1 |
|
规格书 |
SWIFT™ | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | 1.8V | 8A | 4V ~ 6V | Buck | 700kHz | Board(s) | TPS54810 |
|
|
551011367-021EVAL BOARD FOR LM2599 |
1 |
|
规格书 |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | - | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LM2599 |
|
|
551600236-001/NOPBEVAL BOARD FOR LM2267X 8PSOP |
1 |
|
- |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LM2267X 8-PSOP |
|
551600610-001/NOPBEVAL BOARD FOR LMZ2360X |
1 |
|
- |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | - | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LMZ2360x |
|
|
551600612-001/NOPBEVAL BOARD FOR LMZ236XX |
1 |
|
- |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | - | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LMZ236xx |
|
|
LM5022SEPBLDT/NOPBWEBENCH BUILD IT BOARD LM5022 |
1 |
|
- |
- | Box | Obsolete | - | - | - | - | - | - | - | - | Unpopulated (Bare) Board(s) | - |
|
|
551600233-001/NOPBEVAL BOARD FOR LM2267X TO263 |
0 |
|
规格书 |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | 1 Non-Isolated Output | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LM2267x TO-263 |
|
|
551600611-001/NOPBEVAL BOARD FOR LMZ136XX |
0 |
|
- |
WEBENCH® Buildit Board | Bulk | Obsolete | DC/DC, Step Down | - | - | - | - | - | Buck | - | Unpopulated (Bare) Board(s) | LMZ136xx |